02 Infrastructure 17.06.2024 — 21.01.2025 FHI 360 / USAID

Technical support of IT infrastructure of NTP

Servers, networks and NTP user support: 350 corporate mailboxes, network assessment at 154 sites, backup.

350 corporate mailboxes
154 sites with network assessment
67 cities and regions
01

Goal

Ensuring the uninterrupted operation of computer and server equipment of the State Institution “Republican Center for the Protection of the Population from Tuberculosis”.

02

Task

Technical support for the performance of NTP computer and server equipment.

03

Work

Maintenance of server, network and computer infrastructure: diagnostics and elimination of network faults, configuration of equipment for secretaries of TB consultations, technical analysis of server infrastructure and preparation of specifications for network modernization. A system for processing technical requests and a corporate mail server for 350 mailboxes have been deployed.

04 · Result

The uninterrupted operation of server and computer equipment is ensured, backup is configured, server equipment is put in order taking into account physical security.